No Profanity *** No Flaming *** No Advertising *** No Anti Trappers ***NO POLITICS
No Non-Target Catches *** No Links to Anti-trapping Sites *** No Avoiding Profanity Filter


Home~Trap Talk~ADC Forum~Trap Shed~Wilderness Trapping~International Trappers~Fur Handling

Auction Forum~Trapper Tips~Links~Gallery~Basic Sets~Convention Calendar~Chat~ Trap Collecting Forum

Trapper's Humor~Strictly Trapping~Fur Buyers Directory~Mugshots~Fur Sale Directory~Wildcrafting~The Pen and Quill

Trapper's Tales~Words From The Past~Legends~Archives~Kids Forum~Lure Formulators Forum~ Fermenter's Forum


~~~ Dobbins' Products Catalog ~~~


Minnesota Trapline Products
Please support our sponsor for the Trappers Talk Page - Minnesota Trapline Products


Print Thread
Hop To
Page 1 of 2 1 2
Incompetent carpenter, help? #7741110
12/11/22 06:42 PM
12/11/22 06:42 PM
Joined: Jan 2018
Posts: 4,524
MN
D
Donnersurvivor Offline OP
trapper
Donnersurvivor  Offline OP
trapper
D

Joined: Jan 2018
Posts: 4,524
MN
I forgot to install a header over the door. Can anyone tell me how to add a 2x12 without disassembling the whole front wall?

[Linked Image]

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741121
12/11/22 06:46 PM
12/11/22 06:46 PM
Joined: Jan 2007
Posts: 25,424
Georgia
warrior Offline
trapper
warrior  Offline
trapper

Joined: Jan 2007
Posts: 25,424
Georgia
Gable end just set it on the top plate.

Hip end cut the inner stud of the doubles into a jack stud and slide it in.


[Linked Image]
Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741123
12/11/22 06:48 PM
12/11/22 06:48 PM
Joined: Jan 2007
Posts: 17,783
MN
1
160user Offline
trapper
160user  Offline
trapper
1

Joined: Jan 2007
Posts: 17,783
MN
Will the opening still be big enough after you add a 2x12? If so I would add one on the inside and the outside and be done with it. If the rough opening you have now is what you need for height then you have a little problem.


I have nothing clever to put here.





Re: Incompetent carpenter, help? [Re: 160user] #7741125
12/11/22 06:50 PM
12/11/22 06:50 PM
Joined: Jan 2018
Posts: 4,524
MN
D
Donnersurvivor Offline OP
trapper
Donnersurvivor  Offline OP
trapper
D

Joined: Jan 2018
Posts: 4,524
MN
Originally Posted by warrior
Gable end just set it on the top plate.

Hip end cut the inner stud of the doubles into a jack stud and slide it in.


Explain it to me like I'm 5.

Originally Posted by 160user
Will the opening still be big enough after you add a 2x12? If so I would add one on the inside and the outside and be done with it. If the rough opening you have now is what you need for height then you have a little problem.


Okay that's what I was thinking. Thanks!

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741127
12/11/22 06:51 PM
12/11/22 06:51 PM
Joined: Oct 2017
Posts: 13
Wisconsin
1
1Woodtick Offline
trapper
1Woodtick  Offline
trapper
1

Joined: Oct 2017
Posts: 13
Wisconsin
Move the doubled up studs on each side over 3", add (2) shoulder studs on each side, then set the header.

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741130
12/11/22 06:53 PM
12/11/22 06:53 PM
Joined: Oct 2012
Posts: 3,897
Wisconsin
E
Eagleye Offline
trapper
Eagleye  Offline
trapper
E

Joined: Oct 2012
Posts: 3,897
Wisconsin
What type of door are you putting in?

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741135
12/11/22 06:54 PM
12/11/22 06:54 PM
Joined: Jun 2016
Posts: 13,964
Michigan
T
Trapper Dahlgren Offline
trapper
Trapper Dahlgren  Offline
trapper
T

Joined: Jun 2016
Posts: 13,964
Michigan
what woodtick says

Re: Incompetent carpenter, help? [Re: 1Woodtick] #7741138
12/11/22 06:57 PM
12/11/22 06:57 PM
Joined: Jan 2007
Posts: 17,783
MN
1
160user Offline
trapper
160user  Offline
trapper
1

Joined: Jan 2007
Posts: 17,783
MN
Originally Posted by 1Woodtick
Move the doubled up studs on each side over 3", add (2) shoulder studs on each side, then set the header.


This is what I was (poorly) trying to explain.


I have nothing clever to put here.





Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741167
12/11/22 07:17 PM
12/11/22 07:17 PM
Joined: Jan 2007
Posts: 25,424
Georgia
warrior Offline
trapper
warrior  Offline
trapper

Joined: Jan 2007
Posts: 25,424
Georgia
My explanation is if the opening is correct (door unit - casing +1") and height of wall is 96"+ and standard height walk in door.

If there are other errors such as no casing or height allowance then something has to move.

Woodtick is saying basically the same thing. Though a single jack aka shoulder stud should suffice a double is better.

It looks like that is going to be a gable end (wall straight up to the rafters) and not a hip (rafters all the way around). If so you can run the header on top of the wall as long as each end of the header sits on the doubled studs. The doubled studs are carrying the weight of the header and everything the header carries. Everything below the header is just fill in and of no real weight if kept reasonable. Ideally you want the header as close to the opening (lower) to avoid excess filler and unsupported weight. But in 8'-10' walls it's not really an issue unless the openings are really wide or low.


[Linked Image]
Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741169
12/11/22 07:19 PM
12/11/22 07:19 PM
Joined: Jan 2018
Posts: 4,524
MN
D
Donnersurvivor Offline OP
trapper
Donnersurvivor  Offline OP
trapper
D

Joined: Jan 2018
Posts: 4,524
MN
Sorry this is my fault for not explaining. Trying to do double wide barn doors. That whole opening will be doors

Last edited by Donnersurvivor; 12/11/22 07:19 PM.
Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741174
12/11/22 07:25 PM
12/11/22 07:25 PM
Joined: Jan 2007
Posts: 25,424
Georgia
warrior Offline
trapper
warrior  Offline
trapper

Joined: Jan 2007
Posts: 25,424
Georgia
The type of door has no real bearing of the header unless it is hung from the header like a roll up or those side sliding barn doors. The header carries the weight load of the structure above.

If they are side hinged the casing strength or strength of the doubles if hinged directly off the frame is what matters, particularly if the doors are heavy. The casing and/or doubles also need to be square and plumb on all planes.


[Linked Image]
Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741178
12/11/22 07:27 PM
12/11/22 07:27 PM
Joined: Oct 2012
Posts: 3,897
Wisconsin
E
Eagleye Offline
trapper
Eagleye  Offline
trapper
E

Joined: Oct 2012
Posts: 3,897
Wisconsin
If you’re making the door- just shoulder stud what you have and add header. If it’s a predetermined standard door- you’ll have to move studs.

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741181
12/11/22 07:30 PM
12/11/22 07:30 PM
Joined: Dec 2006
Posts: 21,536
Sandhills Nebraska
G
Gary Benson Offline
trapper
Gary Benson  Offline
trapper
G

Joined: Dec 2006
Posts: 21,536
Sandhills Nebraska
Two 2x12's is still only 3" and your 2x4 walls are 3 1/2" so you can add a piece of 1/2" plywood between the two 2x12's to get your full 3 1/2" to match the studs.


Life ain't supposed to be easy.
Re: Incompetent carpenter, help? [Re: Gary Benson] #7741196
12/11/22 07:41 PM
12/11/22 07:41 PM
Joined: Jan 2007
Posts: 25,424
Georgia
warrior Offline
trapper
warrior  Offline
trapper

Joined: Jan 2007
Posts: 25,424
Georgia
Originally Posted by Gary Benson
Two 2x12's is still only 3" and your 2x4 walls are 3 1/2" so you can add a piece of 1/2" plywood between the two 2x12's to get your full 3 1/2" to match the studs.


When I was framing we made headers out of 2 2x10 with a 2x4 and nailed the open end to the top plate.

Longer spans might be flitched like you suggest. Usually 2x12 plywood sandwich glued and nailed both sides, sometimes clinched. We even did a few 2x12 1/2" steel bolted beams.

Porch beams were usually boxed 2x with 2x4 or 6 top and bottom.


[Linked Image]
Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741211
12/11/22 07:49 PM
12/11/22 07:49 PM
Joined: Jan 2018
Posts: 4,524
MN
D
Donnersurvivor Offline OP
trapper
Donnersurvivor  Offline OP
trapper
D

Joined: Jan 2018
Posts: 4,524
MN
Thank you for all the help guys, ill post some pictures after tomorrow and get some critique

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741216
12/11/22 07:53 PM
12/11/22 07:53 PM
Joined: Dec 2021
Posts: 986
Louisiana
M
MattLA Offline
trapper
MattLA  Offline
trapper
M

Joined: Dec 2021
Posts: 986
Louisiana
Its how my doors are done.

[Linked Image]

Re: Incompetent carpenter, help? [Re: Donnersurvivor] #7741631
12/12/22 09:11 AM
12/12/22 09:11 AM
Joined: Dec 2012
Posts: 870
Northern WI
L
Line Jumper Offline
trapper
Line Jumper  Offline
trapper
L

Joined: Dec 2012
Posts: 870
Northern WI
If it was me and the rough opening width was correct I would cut off the two inside boards the height of the header, (turn them into cripples), set the header on them and nail it, quick and easy.

Re: Incompetent carpenter, help? [Re: Line Jumper] #7741638
12/12/22 09:29 AM
12/12/22 09:29 AM
Joined: Dec 2012
Posts: 138
Pa
Y
YoteChaser1968 Offline
trapper
YoteChaser1968  Offline
trapper
Y

Joined: Dec 2012
Posts: 138
Pa
Originally Posted by Line Jumper
If it was me and the rough opening width was correct I would cut off the two inside boards the height of the header, (turn them into cripples), set the header on them and nail it, quick and easy.


I am no carpenter but agree. Did a quick sketch of what I think was recommended.

[Linked Image]

Re: Incompetent carpenter, help? [Re: YoteChaser1968] #7741739
12/12/22 12:27 PM
12/12/22 12:27 PM
Joined: Jan 2022
Posts: 1,752
Eastern W by God V
Crowfoot Offline
trapper
Crowfoot  Offline
trapper

Joined: Jan 2022
Posts: 1,752
Eastern W by God V
Originally Posted by YoteChaser1968
Originally Posted by Line Jumper
If it was me and the rough opening width was correct I would cut off the two inside boards the height of the header, (turn them into cripples), set the header on them and nail it, quick and easy.


I am no carpenter but agree. Did a quick sketch of what I think was recommended.

[Linked Image]

They would become the "jack" studs, not cripples.
But is a good plan smile

Re: Incompetent carpenter, help? [Re: YoteChaser1968] #7741797
12/12/22 01:53 PM
12/12/22 01:53 PM
Joined: Mar 2007
Posts: 35,124
McGrath, AK
W
white17 Offline

"General (Mr.Sunshine) Washington"
white17  Offline

"General (Mr.Sunshine) Washington"
W

Joined: Mar 2007
Posts: 35,124
McGrath, AK
Originally Posted by YoteChaser1968
Originally Posted by Line Jumper
If it was me and the rough opening width was correct I would cut off the two inside boards the height of the header, (turn them into cripples), set the header on them and nail it, quick and easy.


I am no carpenter but agree. Did a quick sketch of what I think was recommended.

[Linked Image]



Whether you call them jack studs or shoulder studs doesn't much matter. However, if it matters to you with this building, code REQUIRES any opening 72 inches or more in width, must have two jacks on EACH side of the opening to support the header.

What is that sitting on Donner ?